PDF(9348 KB)
Study on Temperature Control and Crack Prevention of Steep Slope Segment of Roller Compacted Concrete Dam During Construction Period
XING Tan;HU Wencai;WANG Zhenhong
Yellow River ›› 2020, Vol. 42 ›› Issue (2) : 132-137.
PDF(9348 KB)
PDF(9348 KB)
Study on Temperature Control and Crack Prevention of Steep Slope Segment of Roller Compacted Concrete Dam During Construction Period
({{custom_author.role_en}}), {{javascript:window.custom_author_en_index++;}}| {{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
| 〈 |
|
〉 |