Study on Temperature Control and Crack Prevention of Steep Slope Segment of Roller Compacted Concrete Dam During Construction Period

 XING Tan;HU Wencai;WANG Zhenhong

Yellow River ›› 2020, Vol. 1 ›› Issue (2) : 132-137.

PDF(100 KB)
PDF(100 KB)
Yellow River ›› 2020, Vol. 1 ›› Issue (2) : 132-137.
工程建设管理

Study on Temperature Control and Crack Prevention of Steep Slope Segment of Roller Compacted Concrete Dam During Construction Period

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2020, 1(2): 132-137.

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(100 KB)

Accesses

Citation

Detail

Sections
Recommended

/